र.
(close)

Eco-Machine

can a post-industrial waterfront treat the city's waste and its floods with the same landscape?

(role)
research · systems design · urban design
(period)
2020 · one semester
(context)
eastern waterfront · mumbai · cept L3 studio
(status)
studio
The eco-machine. The waterfront as one working landscape: tidal pier, mangrove edge, floating labs, wetland system, water plaza, urban farming, an eco-machine hub. The proposal, redrawn in 2026. fig.01
The eco-machine. The waterfront as one working landscape: tidal pier, mangrove edge, floating labs, wetland system, water plaza, urban farming, an eco-machine hub. The proposal, redrawn in 2026.
(opening)

Thirty hectares of Mumbai's eastern waterfront redesigned as a machine that lets the sea in and cleans what the city sends out.

Mumbai mismanages 93 per cent of its waste; a great deal of it goes into the drains, and the drains go into the sea.

The eastern waterfront. Sassoon Dock to Sewri: docks, bunders, warehouses, a koliwada, a fish market, oil and chemical factories, ship-breaking and metal scrapping. The site is the red rectangle at Prince's and Victoria Docks. fig.02
The eastern waterfront. Sassoon Dock to Sewri: docks, bunders, warehouses, a koliwada, a fish market, oil and chemical factories, ship-breaking and metal scrapping. The site is the red rectangle at Prince's and Victoria Docks.
(00) the waterfront

Sixteen kilometres nobody can reach

Mumbai's eastern waterfront runs sixteen kilometres from Sassoon Dock to Sewri: 966 hectares of docks and bunders built between 1865 and 1915, most of it owned by the port trust, much of it dilapidated or unused, all of it closed to the city behind it.

300,000 sq m of dock land, the city's grain stopping dead at the port wall. fig.03
300,000 sq m of dock land, the city's grain stopping dead at the port wall.
(00) the waterfront

The site from above.

Mumbai's mismanaged waste. 40,00,000 tonnes a year, of which 37,000 tonnes end up in rivers and drains; the dots are the dumping grounds and the drains that feed the creeks. fig.04
Mumbai's mismanaged waste. 40,00,000 tonnes a year, of which 37,000 tonnes end up in rivers and drains; the dots are the dumping grounds and the drains that feed the creeks.
(01) waste

Where 93 per cent goes

Mumbai produces 40,00,000 tonnes of waste a year, 7,025 tonnes a day; 93 per cent of it is mismanaged, and 37,000 tonnes a year end in rivers and drains.

Most of it arrives through city drains and waterways. fig.05–07
Most of it arrives through city drains and waterways.
(01) waste

Global mismanaged waste entering the oceans.

5,025 of mixed waste, 2,000 of debris and silt; a rich family produces 4–5 kg a day, a slum household 500 g. fig.05–07
5,025 of mixed waste, 2,000 of debris and silt; a rich family produces 4–5 kg a day, a slum household 500 g.
(01) waste

Mumbai's waste, 7,025 tonnes a day.

The open drains that carry the city's waste to the sea, and the people who live along them. fig.05–07
The open drains that carry the city's waste to the sea, and the people who live along them.
(01) waste

The nallahs.

The present scenario. Flood areas in blue, dumping sites in orange. Average rainfall 2,142 mm, 96 per cent of it in the monsoon; the storm-water system holds 25 mm a day. fig.08
The present scenario. Flood areas in blue, dumping sites in orange. Average rainfall 2,142 mm, 96 per cent of it in the monsoon; the storm-water system holds 25 mm a day.
(02) flooding

Two thousand millimetres through a twenty-five-millimetre pipe

The same drains carry the monsoon. Average rainfall is 2,142 millimetres a year, 96 per cent of it in four months, into a storm-water system able to accommodate 25 millimetres a day.

Sea-level rise puts forty per cent of the city at risk of regular flooding. fig.09–11
Sea-level rise puts forty per cent of the city at risk of regular flooding.
(02) flooding

Projected areas vulnerable to flooding, 2050.

A clear relation between the low-lying drains and the areas that flood. fig.09–11
A clear relation between the low-lying drains and the areas that flood.
(02) flooding

The storm-water drains and their outfalls.

fig.09–11
(02) flooding

Mumbai's urban flooding, every year.

The site as a transition. A starting point for a replicable design across both ends and the edge, rather than a single project on one plot. fig.12
The site as a transition. A starting point for a replicable design across both ends and the edge, rather than a single project on one plot.
(03) concept

Let the water in

The move is to let the water in.

The modules and their connections, repeated wherever the edge allows. fig.13
The modules and their connections, repeated wherever the edge allows.
(03) concept

Replicable along the waterfront.

The site plan, 2020. Public wetlands as the buffer against the harbour, drainage networks on site, the treatment modules under the public ground, floating modules off the edge. fig.14
The site plan, 2020. Public wetlands as the buffer against the harbour, drainage networks on site, the treatment modules under the public ground, floating modules off the edge.
(04) form

A landscape that treats

The name is borrowed from ecological engineering. An eco-machine is a sequence of living systems, wetland cells, root zones, settling pools, each one a treatment step.

Public ground stepping down to the wetland, the treatment modules beneath it. fig.15–17
Public ground stepping down to the wetland, the treatment modules beneath it.
(04) form

The terraced edge.

A ring over the wetland cell, the harbour beyond it. fig.15–17
A ring over the wetland cell, the harbour beyond it.
(04) form

The water plaza.

A drain rebuilt as a planted channel through the site. fig.15–17
A drain rebuilt as a planted channel through the site.
(04) form

The canal.

(outcome)
Eco-Machine. Thirty hectares of Mumbai's eastern waterfront as a chain of living infrastructure: wetlands as flood buffer, treatment and waste-to-energy underground, public programs above, floating modules collecting the harbour's waste; designed as a module to repeat along the edge. L3 studio, Bachelor of Urban Design, CEPT University. November 2020.
(what I'd do next)
Size it. The proposal set out the loops but never closed the numbers: how much of 7,025 tonnes a day a wetland cell can take, how much of a 2,142 mm monsoon thirty hectares can hold. The climate inventories built three years later are the tool for that.
(key references)
  1. Todd, J. and Josephson, B. (1996). The design of living technologies for waste treatment. Ecological Engineering 6(1–3).
  2. Mathur, A. and da Cunha, D. (Penn) (2009). Soak: Mumbai in an Estuary. Rupa & Co. / NGMA.
  3. McHarg, I.L. (Penn) (1969). Design with Nature. Natural History Press.
(next) Utopias to Heterotopias · surat · migrant housing · linking and stacking →